Zorlu Energy Cooling Tower Strengthening Works
We carried out the structural strengthening works of the Cooling Tower building at the Zorlu Enerji Kızıldere Geothermal Power Plant. The works comprised:
Strengthening walls: Ten external buttress walls were built so that the cooling system inside the building could keep running during the works.
New foundations: A new foundation was built under each strengthening wall.
Anchorage: The strengthening walls were anchored to the existing columns and the new foundations to the existing foundations, so the system acts as one structure.
Anchor pull-out tests: The anchors were pull-out tested under the supervision of the controlling engineer.
Chemical render: Columns and beams with damaged surfaces were repaired and all surfaces were finished with chemical render.
Shotcrete: On the top floor the column stirrups had corroded away, so all columns were re-tied with new stirrups and jacketed with shotcrete.
Carbon fibre: Columns and beams found to be under capacity in the analyses were wrapped with carbon fibre to make up the shortfall.
- Proje Türü
- Güçlendirme İnşaatı
- Konum
- Aydın, Buharkent
- Kapasite
- 2 Blok/ 13,80 mt yükseklik
- Toplam Yapı Alanı
- 948,60 m²
- Yapım Yılı
- 2012
- İşveren
- Zorlu Enerji A.Ş.