3S Kale Energy Hydroelectric Power Plant – Stair Tower

The steel structural components of the stair tower constructed at the 3S Kale Energy Hydroelectric Power Plant were fabricated in our workshop in accordance with the applicable regulations and technical specifications, including all required welding connections.

At the construction site, the column anchor rods were positioned in accordance with the project drawings. The steel structural components prepared in our workshop were transported to the site and erected in accordance with the approved project. The installation was completed and the structure was successfully handed over.

Yıl
2026
İşveren
Yıldırım Çelik Yapı
Konum
Aydın
Yükseklik
18 mt
Metraj
15 ton
Kapsam
Merdiven Kulesinin İmalat, Kaynak ve Montajının Yapılması