Ecogreen Energy – Steel Cantilever Platform Installation
At the Ecogreen Energy facility, epoxy chemical anchors were installed in the existing columns prior to the installation of the steel cantilever structure. Subsequently, the gusset plates, to which the main load-bearing beams would be connected, were welded to the existing factory columns.
The work was completed with the installation of the columns, main load-bearing beams, and secondary beams.
- Proje Türü
- Çelik Yapı Sistemleri
- Konum
- Denizli, Kaklık
- Kapasite
- 25 mt Yükseklik
- Metraj
- 12 tn.
- Yapım Yılı
- 2026
- İşveren
- Uma Çelik Yapı